Construction of a bridge on Route 218
St-Henri-de-Lévis,Québec, 2010
Project description

  • Preparation of digital terrain models to proceed with work
  • Topographic survey of the natural terrain
  • Construction surveying and monitoring work
  • Excavation volume calculations
  • As-built statement

Geographic location
Images attached to the project
Our services interests you? So let's talk!    Contact us